Outdoor Wood            Furnace
.
Here is the site lay out the only problem I had was from
two out of work F.B.I agents
Running around shouting landing site
The Lone gunmen still live its a Gov cover up : )
The planing stage started Oct. 2001. I was thinking of home brewing one and look into some plans.
And had a few ideas of my own. I am a fair welder with stick and TIG a water and airtight weld is no problem. Then brown reality hit the fan. I soon saw this was going to be a big fab   job and I had no way to transport and handle 4 by 8 sheets of ¼ an ½ inch steel plate by my self . So I started to look at commercial units. Well I thought if I cant build it at least I can install it and have some fun. So here is were this trip starts.

June 15 2002
The big dig for the plumbing is completed
The plumbing was insolated an installed
And the trench was backed filled
Its now July 20, and in all this time we have not had enough
Rain to settle the dust let alone the trench Bummer : (

OOPS
What do you mean you cut a drainage tile  and I all so put a bit of kink in rain a gutter down spout.
Didn't even slow the digger down
When I said I only had one problem Murphy came out of wood work and bit me in the butt.  :  )

The master of ceremonies
The Cad digger has turned out to be the one of the most
Useful projects I have built.